Laserfiche WebLink
1111111111111111111 <br /> 999 <br /> SUNNYSIIIE GOLD CORPORATION <br /> AN ECHO 8"COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> September 3 , 1996 <br /> DENVER <br /> OFFICE <br /> Ms. Sarah Johnson <br /> Stormwater Unit Leader <br /> Colorado Department of Public Health and Environment <br /> WQCD-PE-B2 A(8o►c�a ,�A� �, . F< < <br /> 4300 Cherry Creek Drive South �,F;'� <br /> Denver, Colorado 80222-1530 <br /> RE: CDPS No. CO-0044768, San Juan County <br /> Work Plan submittal requirements for MRP- <br /> Gold Prince Mill Tailings and Waste Dump <br /> E F,� <br /> E- <br /> Dear Ms. Johnson: 1. <br /> This submittal is to satisfy the work plan commitments (Section 4 . <br /> Reports) to submit seal designs for the bulkheads to be placed in <br /> the Gold Prince No. 1 Level portal prior to installation. Upon <br /> opening and inspection of the tunnel, it was determined that this <br /> project requires two bulkheads; one in solid ground approximately <br /> 150 feet from the portal and one near surface to impound the near <br /> surface groundwater and reestablish the natural flow of groundwater <br /> in the weathered near-surface rock. <br /> These designs are similar to those used for construction of the <br /> Sunnyside Mine bulkheads and were provided by the same design <br /> engineer, John F. Abel, Jr. <br /> Please contact me if you have any questions. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br /> cc: Wally Erickson, DMG enclosure (September 3 , 1996 Letter <br /> submittal to DMG w/bulkhead design) <br />