Laserfiche WebLink
load the tailings on a truck, which will deliver the tailings to either the Revenue Waste Pile or the <br />Atlas Waste Pile to the west. <br />5. Surface Facilities <br />The proposed surface facilities are shown on Maps C -2 through C -4. Minor changes may be <br />made to the proposed layouts during construction; however, construction activities will be <br />confined to the permit area and collection basins. The majority of material excavated <br />underground will be processed in the mill, but about 20% will be hauled out of the mine portal as <br />waste rock to be stored in the waste embankment or sold from the site. <br />A surface equipment list can be found below in Section 6. The surface facilities at the Revenue <br />Mine include the following items: <br />• 2 Tailings /waste rock embankments (Revenue Pile and Atlas Pile) <br />• Temporary waste rock stockpile area <br />• Topsoil stockpile areas <br />• Sediment Ponds #1 and #2 <br />• Mine Water Pond #3 <br />• Avalanche protection buffers and cribbing <br />• Mine Equipment storage and maintenance shop building on 6" concrete foundation <br />• Mine offices and Lunch room on 6" concrete foundation <br />• Dry room trailers (3) covered by a corrugated metal building <br />• Designated parking and storage areas <br />• Mine access road (compacted gravel) <br />• Compressor Building on 6" concrete foundation <br />Revenue Mine August 2012 D - <br />