Laserfiche WebLink
• Solid waste storage bins (for trash). Each bin will be 250 gallons in volume. <br />• 3 Ventilation shafts (proposed and not connected to the surface facility area) <br />• 2 power poles <br />• Drainage collection and diversion structures <br />• Sneffels diversion intake structure and 12" HPDE pipe <br />• Ventilation fan at Revenue portal <br />• Septic tank <br />• Tailings Surge Building and Loadout from Mill Tunnel lon 6" concrete foundation <br />• 2 - 4200 gallon portable fuel tanks <br />• Small sections of 24' wide mine track <br />• Revenue portal <br />• Mill Portal <br />• Underground storage portals (2) <br />• 2 old historical wooden structures from the 1880's that will be disturbed to make room <br />for Sediment Pond #2 and Mine Water Pond #3. <br />Approximately 60 -65% of the proposed surface disturbance at the Revenue Mine will be on land <br />that was disturbed historically and never reclaimed Almost no reclamation has taken place on <br />the disturbed areas of the site over the history of the Revenue Mine, but the mine has only been <br />inactive since 2004. <br />Table D -1 below shows a breakdown of proposed surface disturbance between previously <br />impacted areas and areas that were not impacted extensively by historic operations. <br />Revenue Mine August 2012 D -7 <br />