Laserfiche WebLink
NOV C-84-103 <br /> The operator has salvaged all available topsoil from the embankments of <br /> the three temporary sediment ponds constructed at the Rock Tunnel waste <br /> disposal area. Violation Terminated. <br /> NOV C-84-106 <br /> 1 . The operator submitted designs in accordance with Rule 4.05.9(2) for the <br /> preparation plant fresh water pond and the Arctic Circle fresh water <br /> pond. <br /> 2. The operator has submitted designs in accordance with Rule 4.05.9(2) for <br /> the preparation plant slurry pond. <br /> 3. The operator has submitted designs for the preparation plant drainage <br /> ditch in accordance with Rule 4.05.3. <br /> Violation Terminated. <br />