Trash and debris which may be encountered in the vicinity of the Project Area shall be removed <br /> from the site by CONTRACTOR. Some amount of trash and debris may be encountered during <br /> grading and ripping operations. All trash and debris shall be disposed of in a properly licensed <br /> land fill facility, or may be salvaged by CONTRACTOR. Prior to removal from the site, <br /> PROJECT MANAGER and CONTRACTOR may mutually agree upon a temporary site to store <br /> trash and debris. <br /> A single or double ditch is located on the inside portion of most roads. These ditches carried <br /> water to the culverts which were eliminated in Task 2, Culvert Removal. In some locations, a <br /> berm is also present at the outside portion of the roads. These berms will be eliminated during <br /> Task 3, Road Grading. <br /> The estimated lengths of the roads to be reclaimed are: <br /> Road B 3,700 Feet <br /> Road C 15,800 Feet <br /> Road D 9,360 Feet <br /> Huntsman Ridge Road 8,000 Feet <br /> Cross Sections B-1 through C-30 depict the slope of the roads. The slope is defined as the <br /> angle of the roads as measured perpendicular to the road running surface. The location of each <br /> cross section is depicted on Map 4, Hydrologic Structures. <br /> Road grading will be accomplished in this task by reversing the current road slope so that a <br /> minimum slope of seven percent (7%) to the outside road margin is achieved. Grading shall be <br /> conducted so that when completed the seven percent (7%) slope to the outside margin is <br /> uniform from the top of the fill at the inside margin to the crest of the outside margin of the road. <br /> Material to complete the road grading and ditch elimination work shall be obtained primarily from <br /> the outside edge of the road, and from the crown of the road, where one may exist. Where <br /> material is excavated from the outside edge of the road, no cut slope shall be steeper than 3 H <br /> 1 V. All cuts shall be uniformly excavated so that the down slope extent of excavation is <br /> relatively uniform in elevation. The beginning and end of all cut areas shall be graded to blend <br /> with adjacent un-excavated slopes. Sharp breaks in gradient between the road surface and the <br /> cut slope shall not be permitted. Excavation shall occur so that the outside road surface blends <br /> into the cut slope. <br /> All road surfaces shall be ripped to a minimum depth of fifteen inches (15") on no greater than <br /> eighteen inch (18") centers. Where bedrock outcrops occur, ripping to a shallower depth will be <br /> allowed. In all instances, ripping shall be accomplished sub-parallel to the road running surface. <br /> Ripping shall begin along the outside margin of the graded road surfaces, and proceed toward <br /> the inside margin at a thirty degree (300)to forty five degree (450) angle. The entire width of the <br /> graded road from outside margin to the inside margin of the road benches will be ripped. <br /> Huntsman Ridge Road <br /> No grading of the Huntsman Ridge Road will occur. Following culvert removal, and in <br /> conjunction with rolled dip and low water crossing construction, the road will be ripped. Ripping <br /> will occur parallel to the road running surface. The road surface shall be ripped to a minimum <br /> depth of fifteen inches (15") on no greater than eighteen inch (18") centers. Where bedrock <br /> outcrops occur, ripping to a shallower depth will be allowed. <br /> 11 <br />