My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (268)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (268)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:16:45 AM
Creation date
6/22/2012 1:30:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) South Basin Road
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Culvert No. Diameter Depth of Inlet Depth of Outlet <br /> (inches)* Burial (approx.) Burial (approx.) <br /> (feet) (feet) <br /> C 6 36 4 6 <br /> C 7 24 1.5 8 <br /> D 1 24 1 4 <br /> D 1a 24 1 4 <br /> D 2 24 1 2 <br /> D 3 24 1 6 <br /> D 3a 18 1 2 <br /> D 3n 18 1 5 <br /> D 4 18 1 3 <br /> D 4a 18 1 6 <br /> H 1 *' 24 2 3 <br /> H2 ** 30 1 2 <br /> Diameter obtained from permit document, when available. <br /> " The length of the Huntsman Ridge Road culverts (H 1, H 2) averages twenty feet (20'). <br /> Measurement and Payment <br /> Payment for removal of the culverts shall be at the unit price bid in Item 2 of the Bid Schedule <br /> per culvert removed. Such payment shall be considered full compensation for all labor, <br /> materials, equipment and all other items necessary and incidental to the removal and disposal <br /> of the culverts, filling and compaction of the trenches excavated for the culvert removal, as well <br /> as demolition and removal of all associated structures. Payment shall be as this task is <br /> completed and approved by the PROJECT MANAGER. <br /> TASK 3 ROAD GRADING <br /> Roads B, C, D <br /> Map 3, Road Project Map, depicts the locations of the roads subject to reclamation during <br /> execution of this project. Execution of Task 3 will result in grading of the road surfaces to <br /> achieve the road surface reclamation design specifications and elimination of the drainage ditch <br /> network. The drainage ditches are located along the inside portion of the roadways. Berms <br /> may be located along the outside edge of some portions of the roadways. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.