Laserfiche WebLink
For Road Surfaces, Including Cuts and Fills Created During Completion of This Project <br /> (Estimated 40 ACRES): <br /> - Seedbed preparation for the road segments, including the adjacent cut and fill surfaces <br /> created during the road grading process, was accomplished during completion of the road <br /> grading and ripping (Task 3, Road Grading). <br /> - Broadcast application of seed and fertilizer and hand mulching and crimping will be required. <br /> ALL AREAS TO BE REVEGETATED: <br /> Seed <br /> Seed will be provided by the OWNER. The CONTRACTOR must give the PROJECT <br /> MANAGER at least ten 00) working days notice of the acreage to be seeded, so that the <br /> proper amount of seed is delivered. <br /> Fertilizers <br /> Commercial fertilizer is required for this project. Fertilizer shall be provided by CONTRACTOR, <br /> and shall conform to Section 20.2 of the Revegetation Specifications. <br /> Mulches <br /> Mulching is required for this project. Mulch shall be provided by CONTRACTOR, and shall <br /> conform to Section 20.2 of the Revegetation Specifications. All mulch shall be certified as <br /> noxious weed free or noxious weed seed free by any authorized State or County Officer. <br /> Timing of Seed Application <br /> Due to site conditions no revegetation efforts on Roads B C D may be initiated prior to <br /> September 15, 2000. Revegetation efforts may begin no earlier than September 1 2000 on the <br /> Huntsman Ridge Road. <br /> Application <br /> Seed must be broadcast using a hand held broadcast seed applicator. <br /> Measurement and Payment <br /> Measurement and payment for this Task will be as per Specification 20.0 of the "General Work <br /> Specifications, Colorado Inactive Mine Reclamation Program", 1996. Revegetated areas will be <br /> measured to the nearest 0.1 acre and paid at the unit price bid on the Bid Schedule Item 6. The <br /> price bid shall include all costs for labor, materials, equipment and all other items necessary for <br /> revegetation as described in these specifications. <br /> TASK 7 EQUIPMENT RENTAL <br /> During reclamation activities areas requiring additional grading, excavation, slope reduction, <br /> and/or erosion control work under the direction of the PROJECT MANAGER will be addressed. <br /> A CAT D-51-1 dozer or equivalent 90 FHP machine with ripper and operator, a CAT 416B <br /> Backhoe loader or equivalent 74 FHP machine with operator shall be furnished for additional <br /> work as needed. <br /> 16 <br />