Laserfiche WebLink
considered full compensation for all labor, materials, equipment and all other items necessary <br /> and incidental to the construction of the low water crossings. <br /> TASK 6 REVEGETATION <br /> All areas disturbed during reclamation work and any other areas specified in these Special <br /> Conditions will be revegetated according to the Revegetation Specifications in the General Bid <br /> Specifications Section 20.0, except as modified by these Special Conditions. All areas will be <br /> seeded with the "Mine Site Seed Mixture", (Table 1). <br /> Areas to be revegetated include the road surfaces, including the cuts and fills created during <br /> completion of this Project, and adjacent Cut and Fill slopes identified by PROJECT MANAGER. <br /> The adjacent Cut and Fill slopes were created during construction of the road network, and , <br /> except for these revegetation requirements, would not otherwise be impacted by this Project. <br /> These slopes, which are generally located adjacent to the roads, exhibit little vegetative cover, <br /> and therefore require revegetation. <br /> In addition to the revegetation specifications outlined in Section 20.0, Revegetation, the <br /> following requirements will be adhered to: <br /> For Cut and Fill Slopes Adjacent to the Roads (Estimated 5 ACRES): <br /> Seedbed preparation for adjacent cut and fill slopes which have been identified in the field by <br /> PROJECT MANAGER will be accomplished in the following manner: <br /> - A surface veneer of straw or hay mulch will be applied to the cut or fill slope <br /> surface; <br /> - The cut and fill slopes will be scarified using a Macleod Fire Rake/ Hoe. Gouges <br /> will be created using the Macleod Fire Rake/ Hoe which measure ten inches <br /> (10") from side to side, are approximately six inches (6")from front to back, and <br /> are a minimum of four inches (4") deep at the back cut. The gouges will be <br /> spaced no further than twelve inches distant from each other in any direction, <br /> and will completely cover the cut and fill slopes identified for these activities. It is <br /> necessary to start at the top of the cut and fill slopes, and work down the slopes <br /> when constructing the gouges. PROJECT MANAGER will delineate the _ <br /> boundaries of each cut and fill slope before seedbed preparation begins. <br /> Following construction of the gouges, access to these slopes will be limited to the <br /> sides or margins of each slope. <br /> - Broadcast application of seed and fertilizer and hand mulching is required. In <br /> order to protect the gouges from being filled with dirt, application of seed and <br /> fertilizer should be accomplished as gouge construction proceeds. Mulch will be <br /> applied from the crest of the cuts and fills following gouge construction and <br /> seeding and fertilization. <br /> 15 <br />