My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (273)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (273)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:26:02 AM
Creation date
6/22/2012 1:29:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 2000Tree Planting
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(f) Minority(MBE)/women (WBE) Business Participation form; <br /> (g) Three-Way Agreement for Reclamation Activities, if required by the <br /> Special Conditions; <br /> (h) A list of all subcontractors to be used on the project, the work tasks and <br /> dollar value to be subcontracted to each, and <br /> (h) Completed W-9 forms, if required (for contractors new to the State). <br /> Please consult Articles 2-7 of the General Conditions. <br /> If the above documents are not submitted properly by the contract signing date, the Division of <br /> Minerals and Geology may elect to award the contract to the next lowest bidder. Bidders are <br /> advised to keep close contact with DMG during this period. <br /> THREE-WAY AGREEMENT <br /> A three way "Agreement for Reclamation Activities" is not required for this job. Please see <br /> Article 4 of the General Conditions for the applicable insurance requirements. <br /> CONDITIONS AFFECTING THE WORK <br /> In addition to examining the drawings and specifications, completion schedule, and other <br /> instructions, bidders shall visit the site and take such other steps as may be reasonably <br /> necessary to ascertain the nature and location of the work, including average climatic conditions <br /> and the general and local conditions which can affect the work or the cost thereof. Failure to do <br /> so will not relieve bidders from responsibility for estimating properly the difficulty or cost of <br /> successfully performing the work. <br /> PROJECT FUNDING <br /> This project is funded 100% through monies made available to the State of Colorado through <br /> revocation of bond monies retained by the Division of Minerals and Geology for reclamation of <br /> this previously permitted mining operation. <br /> AMERICANS WITH DISABILITIES ACT <br /> All programs, services and activities of the Department of Natural Resources, Division of <br /> Minerals and Geology and the Colorado mined Land Reclamation Board are operated in <br /> compliance with the Americans with Disabilities Act. Questions, complaints and requests for <br /> additional information may be directed to ADA Coordinator, Department of Natural Resources, <br /> 1313 Sherman Street, Room 718, Denver, CO 80203. <br /> VENDOR OFFSET <br /> Pursuant to C.R.S. 24-30-202.4 (as amended), the State Controller may withhold debts owed to <br /> state agencies under the vendor offset intercept system for(a) unpaid child support debt or child <br /> support arrearages; (b) unpaid balance of tax, accrued interest, or other charges specified in <br /> Article 22, Title 39, C.R.S.; • unpaid loans due to the student loan division of the Department of <br /> Higher Education; (d) owed amounts required to be paid to the unemployment compensation <br /> fund; and (e) other unpaid debts owing to the State or any agency thereof, the amount of which <br /> is found to be owing as a result of final agency determination or reduced to judgement as <br /> certified by the Controller. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.