Laserfiche WebLink
project. If several contractors propose to join together to perform the work under this purchase <br /> order contract, equipment owned or controlled by each should be listed and the owner <br /> identified. A purchase order contract will not be awarded to a bidder who in the opinion of the <br /> OWNER (a) does not have adequate equipment, or (b) does not have firm and satisfactory <br /> arrangements to obtain adequate equipment to perform the work described in the Invitation and <br /> Bid. <br /> BID AWARD <br /> Award will be made with reasonable promptness, by written notice to the low responsive and <br /> responsible bidder whose bid meets the requirements and criteria set forth in the Invitation for <br /> bid. These criteria will include, but not be limited to the lowest GRAND TOTAL PRICE, <br /> corrected if necessary for errors in price extension and/or addition, on the Bidder's equipment if <br /> a List of Equipment Offered is required with the bid, and capability to meet the performance time <br /> requirements. The GRAND TOTAL PRICE will be used for comparing bids only. <br /> GENERAL BID SPECIFICATIONS <br /> The Colorado Inactive Mine Reclamation Program General Bid Specifications 1996, which <br /> include General Conditions, Standard Work Specifications, and Standard Drawings and Figures <br /> are intended to complement these Special Conditions. The Special Conditions combined with <br /> the General Bid Specifications 1996form the complete Invitation and Bid document. Please <br /> refer to the Standard Work Specifications for all applicable types of work required in the Special <br /> Conditions. The General Conditions apply to all work covered in the Special Conditions. <br /> Copies of the General Bid Specifications are available at the Pre-Bid Meeting or from the <br /> Division of Minerals and Geology (DMG), 1313 Sherman Street, Room 215, Denver, Colorado <br /> 80203 (303) 866-3567. <br /> PROJECT DATES <br /> The project is scheduled for construction between September 18, 2000 and October 10, 2000. <br /> This includes mobilization and demobilization time. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is twenty two (22) calendar days after receipt of <br /> the Notice to Proceed. This includes mobilization and demobilization time. <br /> LIQUIDATED DAMAGES <br /> The liquidated damages for this project will be $400.00 per day. Please see General <br /> Conditions, Articles 34, 35 and 40. <br /> NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br /> A Notice of Award will be sent to the apparent low bidder within four (4) days of the bid opening. <br /> The contract signing date and time will be set for fourteen (14) days after the bid opening. The <br /> Division of Minerals and Geology must receive the following: <br /> (a) Executed Agreement; <br /> (b) Fully-executed Performance and Payment Bonds, accompanied by <br /> appropriate Power of Attorney, effectively dated; <br /> (c) Certificates of Insurance showing proof of required coverage and <br /> Additional Insured Endorsement; <br /> (d) Project schedule; <br /> (e) AML Contractor Ownership and Control Form; <br /> 3 <br />