Laserfiche WebLink
transporting and anchoring them to hill slopes and other surfaces; construction of brush layers, <br /> transportation and installation of pre-vegetated wattles, digging trenches in consolidated and <br /> unconsolidated materials; transplanting shrubs in the vicinity of the Project Area; anchoring <br /> shrub cuttings; transporting and hand placing rock materials within gullies; hand mulching and <br /> seeding as well as other miscellaneous activities. CONTRACTOR must provide appropriate <br /> hand tools and transportation (four wheel all terrain vehicle) in good working condition for <br /> laborer(s) to accomplish these miscellaneous projects. PROJECT MANAGER will provide <br /> specifications for specific laborer constructed structures at the time that the work is required. <br /> The hours outlined in Item 8 of the Bid Schedule are NOT guaranteed. All work will be <br /> accomplished according to Specification 19.0, Equipment Rental. <br /> Measurement and Payment <br /> Measurement and payment will be made as per Specification 19.0, Equipment Rental. Payment <br /> will be made at the unit prices established in Item 8 of the Bid Schedule. The hours outlined in <br /> Item 8 of the Bid Schedule are NOT guaranteed. <br /> TASK 9 ROAD REHABILITATION <br /> Specifically included within Task 1 is the CONTRTACTORS responsibility to rehabilitate the <br /> previously reclaimed roads that will be used to access the mine bench outslopes. Portions of <br /> Roads B, D, E and F (see attached Project Area map) will be traversed to access the work sites. <br /> Each of these roads has been previously reclaimed. Access to the work areas will be restricted <br /> to a two wheel track that CONTRACTOR will establish at each road. All traffic must be <br /> restricted to the two wheel track. <br /> Following completion of all work tasks requiring motorized access across a road, <br /> CONTRACTOR will accomplish road reclamation rehabilitation. Rehabilitation will be <br /> accomplished by dozer ripping the access track and any other disturbances as directed by <br /> PROJECT MANAGER, and reconstruction of all low water crossings and water bars located on <br /> the road as directed by PROJECT MANAGER. Following ripping and water bar/ low water <br /> crossing reconstruction, the areas affected by these activities will be revegetated. It is <br /> estimated that approximately ten (10) acres will be revegetated as part of the road rehabilitation <br /> Task. CONTRACTOR will supply all materials (excepting seed), labor and equipment <br /> necessary and incidental to completing this Task. <br /> Revegetation will occur in the following manner: <br /> Seed <br /> The OWNER will provide seed. CONTRACTOR must give the PROJECT MANAGER at least <br /> fifteen 05) working days notice of the acreage to be seeded, so that the proper amount of seed <br /> is delivered. Hand written acreage calculations are acceptable. All areas will be seeded with <br /> the "Coal Basin Mine Site Seed Mixture", (Table 2). It is anticipated that the seed will be <br /> broadcast applied to the road surfaces at the rate specified in Table 2. <br /> Fertilizer <br /> Commercial fertilizer is required for this Task, and will be supplied by CONTRACTOR. It is <br /> anticipated that the fertilizer will be broadcast applied to the road surfaces. <br /> 17 <br />