Task 8: Road Rehabilitation <br /> NOTE that volumes, distances and areas stated in this document are ESTIMATIONS <br /> ONLY. CONTRACTORS are responsible for verifying all estimations prior to bid <br /> submittal. <br /> TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This task includes those measures necessary and incidental to move equipment and supplies <br /> onto the Project Area, to move equipment within the Project Area during prosecution of the <br /> Project, and to complete any other requirements necessary to perform this Project. This item <br /> also includes all labor, equipment, and costs associated with demobilization and clean-up of the <br /> work site following completion of the Project. Please see Specification 1.0, Mobilization / <br /> Demobilization of the General Bid Specifications, Colorado Inactive Mine Reclamation Program, <br /> 2004. <br /> A copy of the General Bid Specifications, 2004, may be obtained from: <br /> Division of Minerals and Geology <br /> 1313 Sherman Street Room 215 <br /> Denver, Colorado 80203 <br /> 303-866-3567 <br /> Specifically included within Task 1 is the CONTRTACTORS responsibility to minimize <br /> disturbance to previously reclaimed areas, including old roads and each mine bench. Portions <br /> of Roads B, D, E, F and G (see attached Project Area map) will be traversed to access the work <br /> sites. Each of these roads has been previously reclaimed. Access to the work areas via these <br /> reclaimed roads will be restricted to a two wheel track that CONTRACTOR will establish at each <br /> road. All traffic must be restricted to the two wheel track through the duration of the project. <br /> Operation of motorized equipment, including all terrain vehicles, outside of the established track <br /> is prohibited. <br /> Contractor MUST comply with the following provisions during performance of this Project: <br /> CONTRACTOR will exercise care to preserve the natural landscape and shall conduct all <br /> operations in a manner which minimizes disturbance and prevents any unnecessary <br /> destruction, scarring, or defacing of the natural surroundings in the vicinity of the work. No <br /> clearing shall be conducted without prior approval of the PROJECT MANAGER and without an <br /> approved sediment control structure in place and functional, as required by PROJECT <br /> MANAGER, until construction is completed. Generally, silt fence, installed per manufacturers <br /> specifications is acceptable as a sediment control measure. Where clearing has prior approval <br /> of the PROJECT MANAGER, all trees, native shrubbery and vegetation will be preserved and <br /> protected to the extent practical from damage caused by CONTRACTORS operation and <br /> equipment. All routes for movement of materials shall be subject to Project Manager prior <br /> approval. <br /> 7 <br />