Laserfiche WebLink
Waste materials, including but not limited to refuse, garbage, sanitary wastes, spent solvents; oil <br /> and other petroleum products shall be disposed of by CONTRACTOR off of the Project Area in <br /> accordance with applicable laws and regulations. CONTRACTOR will specify to PROJECT <br /> MANAGER proposed methods for all waste collection and disposal, modes of waste transport, <br /> and waste disposal facilities and locations CONTRACTOR and subcontractors will use while <br /> performing the work, including making any necessary arrangements for waste collection and <br /> disposal. Any fees or charges required to be paid for collection, transport or disposal of waste <br /> materials shall be paid by CONTRACTOR. <br /> At its expense, CONTRACTOR will comply with all applicable federal, state, and local laws, <br /> ordinances, rules and regulations relating to the Work, the Site, and any materials and/or <br /> equipment provided by CONTRACTOR. <br /> CONTRACTOR will have a drug and alcohol policy in place, and available for review by <br /> PROJECT MANAGER. Alcohol and drugs are NOT permitted within the Project Area. <br /> CONTRACTOR will NOT permit the existence or use of firearms within the Project Area. <br /> Measurement and Payment <br /> Payment for Task 1 shall be reflected in a lump sum bid price under Item 1 on the Invitation and <br /> Bid sheet. Payment shall include all the CONTRACTORS expenses for mobilization of <br /> equipment to the site, transportation of the equipment within the Project Area, employee time, <br /> labor and materials necessary to accomplish the requirements of this Task, compliance with the <br /> conditions and requirements described in this Task description, and final clean up of the work <br /> place. <br /> If the price bid for mobilization and demobilization is greater than 15 percent(15%) of the total <br /> contract price, invoices supporting the mobilization costs will be required before payment is <br /> approved. <br /> Payment shall be made as described in Specification 1.0, Mobilization/Demobilization of the <br /> General Bid Specifications, Colorado Inactive Mine Reclamation Program, 2004. <br /> TASK 2 PROJECT SAFETY PLAN <br /> Due to the remoteness of the Project Area, certain safety requirements will be necessary for the <br /> CONTRACTOR to follow. A Project Safety Plan will need to be written and adopted by the <br /> CONTRACTOR, its employees and any sub-contractors. <br /> CONTRACTOR will prepare a Project Safety Plan. CONTRACTOR is required to develop and <br /> implement a Project Safety Plan in conjunction with Project implementation. PROJECT <br /> MANAGER must receive the Project Safety Plan within five (5)working days of Notice to <br /> Proceed date. It is expected that the Project Safety Plan will be comprehensive and sufficiently <br /> detailed so that every member of the work crew (including sub-contractors) on site understands <br /> their responsibilities and the responsibilities of CONTRACTOR to ensure a safe and injury free <br /> work place. <br /> 8 <br />