My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (262)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (262)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:08:18 AM
Creation date
6/21/2012 10:47:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Backfilling and Grading Plan for Preparation Plant Area
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> PROPOSED DECISION <br /> Coal Basin Hines <br /> The Colorado Mined Land Reclamation Division proposes to approve, with <br /> stipulations, an application for a permit to conduct coal mining <br /> submitted by the Mid-Continent Resources, for the Coal Basin Mines. <br /> This approval decision is based on a finding that the proposed operation <br /> will comply with all requirements of the Colorado Surface Coal Mining <br /> Reclamation Act, C.R.S. 1973, as amended, 34-33-101 et sec . , and the <br /> regulations promulgated pursuant to the Act. <br /> The permit application and the stipulations will become a binding part of <br /> the permit upon approval . The stipulations for the Coal Basin Mines are <br /> as follows: <br /> C= <br /> Stipulation No. 1 <br /> o <br /> PRIOR TO ANY DISTURBANCE AT THE SITE OF THE PROPOSED NEW COAL W v� <br /> PROCESSING WASTE EMBANKMENT, THE PERMITTEE MUST SUBMIT EVIDENCE TO <br /> THE DIVISION THAT LEGAL RIGHT OF ENTRY HAS BEEN OBTAINED FROM THE <br /> U.S. FOREST SERVICE. <br /> Stipulation NO. 2 <br /> PRIOR TO REACTIVATION OF MINE NUMBER 4, THE PERMITTEE MUST <br /> CONSTRUCT THE SEDIMENT PONDS, AS DESIGNED, ON THE SOUTHEAST SIDE OF 1� <br /> THE MINE NO. 4 BENCH. <br /> Stipulation No. 3 Vi <br /> S <br /> WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST REVISE THE <br /> SEDIMENT CONTROL PLANS FOR THE THREE PROPOSED SEDIMENT PONDS AT THE <br /> SITE OF THE NEW COAL PROCESSING WASTE EMBANKMENT. THE PLANS MUST <br /> BE REVISED TO INCLUDE A NON-CLOGGING, GATED DEWATERING DEVICE <br /> LOCATED DIRECTLY ABOVE THE MAXIMUM STORAGE LEVEL OF EACH POND. <br /> Stipulation No. 4 <br /> WITHIN SIX ;MONTHS OF PERMIT•ISSUANCE, THE PERMITTEE SHALL SUBMIT TO <br /> THE DIVISION CERTIFICATION FROM A REGISTERED PROFESSIONAL ENGINEER, <br /> ATTESTING THAT THE SEDIMENT PONDS PRESENT'-'! CONSTRUCTED HAVE BEEN <br /> BUILT AS DESIGNED. CERTIFICATION OF THOSE PONDS YET TO BE <br /> CONSTRUCTED MUST BE SUBMITTED TMMEDIATELY FOLLOWING CONSTRUCTION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.