Laserfiche WebLink
-3- <br /> Stipulation No. 5 <br /> BY FEBRUARY 1 , 1984, THE PERMITTEE SHALL SUBMIT AN ACCEPTABLE PLAN •ASS <br /> FOR SEALING THE ROCK TUNNEL ADITS. THIS PLAN SHALL CONTAIN, AT A <br /> MINIMUM, SPECIFICATIONS FOR SEALING THE PORTIONS OF THE ROCK TUNNEL <br /> THAT CROSS THE COZZETTE, ROLLINS, AND MIDDLE SANDSTONES TO PREVENT <br /> FUTURE MIXING OF WATERS IN THESE AQUIFERS AND SHALL INCLUDE <br /> SPECIFICATIONS FOR SEALING THE ADITS TO PREVENT GROUND WATER FROM <br /> FLOWING FROM THE ROCK TUNNEL ONTO THE SURFACE. <br /> Stipulation No. 6 <br /> PRIOR TO ANY DISTURBANCE AT THE PROPOSED COAL PROCESSING WASTE oNytst'4" • <br /> DISPOSAL AREA, WITH THE EXCEPTION OF THE SITE ACCESS ROAD, THE t �" <br /> PERMITTEE MUST SUBMIT AND RECEIVE THE DIVISION'S APPROVAL OF A <br /> COMPREHENSIVE TOPSOIL SALVAGE AND REDISTRIBUTION PLAN. THIS PLAN <br /> MUST BE BASED ON SITE-SPECIFIC SOIL DEPTH INFORMATION AND SOIL <br /> ANALYSES. AT A MINIMUM, ONE SITE PER SOIL TYPE MUST BE SAMPLED AND <br /> ANALYZED. SAMPLES MUST BE TAKEN BY HORIZON OR TWELVE-INCH <br /> INCREMENTS, WHICHEVER IS SMALLER, TO A .MINIMUM DEPTH OF FOUR FEET. <br /> IN ADDITION, AT LEAST THREE SOIL DEPTH VERIFICATION SITES MUST BE <br /> SAMPLED WITHIN EACH SOIL TYPE TO A MINIMUM DEPTH OF FOUR FEET. <br /> Stipulation No. 7 r/�THE DIVISION DIRECTS THE PERMITTEE TU M <br /> COMPLETE A THOROUGH <br /> GEOTECHNICAL INVESTIGATION AND STABILITY ANALYSIS OF THE PROPOSED <br /> BACKFILLED CONFIGURATIONS FOR THE FIVE PORTAL BENCHES AT THE COAL <br /> BASIN MINES. THE PURPOSE OF THIS PROJECT SHALL BE TO DEVELOP S <br /> SPECIFIC BACKFILLING, GRADING, DRAINAGE, AND RECLAMATION PROCEDURES <br /> TO ASSURE OPTIMUM STABILITY OF THE FINAL RECLAIMED PORTAL BENCHES. fi <br /> I� r!� <br /> FURTHER, THE PERMITTEE SHALL PREPARE A DETAILED MA <br /> TERIAL BALANCE, <br /> DESIGNATING THE PROPOSED SOURCE OF MATERIALS TO BE UTILIZED IN S <br /> COMPLETING THE BACKFILLING AND GRADING OF THE MINE PORTAL AREAS <br /> THE PERMITTEE SHALL SUBMIT THE REPORT OF THE GEOTECHNICAL <br /> INVESTIGATION AND STABILITY ANALYSIS, THE DETAILED MATERIAL <br /> BALANCE, AND A DETAILED PORTAL BENCH RECLAMATION PLAN TO THE <br /> DIVISION FOR REVIEW /rr r <br /> Stipulation No. 3 <br /> THE PERMITTEE SHALL SUBMIT A BACKFILLING AND GRADING PLAN, <br /> INCLUDING CROSS-SECTIONS ANa .MAPS OF THE PROPOSED POST-IIII41NG <br /> CONTOURS, FOR THE PREPARATIONS PLANT AREA TO THE DIVISION ='OR <br /> APPROVAL BY DECEMBER 31 , 1983. THE PERMIT APPLICATION MUST <br /> SUBSEQUENTLY 3E UPDATED TO TICL <br /> GRADING PLAN. UDE THE APPROVED 3ACKFILLIr+G AND <br />