Laserfiche WebLink
-4- <br /> Technical Revisions Approval Date <br /> 1A. Coal Stockpile at Coke December 18, 1981 <br /> Ovens near Redstone <br /> 7A. Coal Processing Waste on August 23, 1984 <br /> Rock Tunnel <br /> 8A. Sutey Conveyor (Phase II) , Access August 23, 1984 <br /> roads, ponds, and stream channel <br /> diversion <br /> 10A. Discontinuance of Ground Water September 11 , 1984 <br /> Wells AT-1 and P-4 (Your MR-10) <br /> 10B. Relocation of Sutey Topsoil October 23, 1984 <br /> and Stream Channel Diversion <br /> 13. Subsidence Monitoring February 3, 1986 <br /> Modification <br /> Note: Your Technical Revision No. 3 was a Minor Revision. <br /> Minor revisions Approval Date <br /> 1A. Exploration of roads for September 1 , 1983 <br /> Conveyor Corridor <br /> 4A. Relocation of Powerline at June 20, 1984 <br /> Preparations Plant <br /> 26. Revision of Stipulation No. 2- February 20, 1986 <br /> Berms around Sutey Topsoil <br /> Section 4 - Stipulation Status <br /> Stipulations are noted as found in the Findings Document for Permit Revision <br /> No. 1 of August, 1984. <br /> Stipulation No. 1 - not applicable until reactivation of Mine No. 4. <br /> Stipulation No. 2 - Revised per Minor Revision to 10 feet in width. <br /> Stipulation No. 3 - Ongoing <br /> Stipulation No. 4 - "Sealing plan for Rock Tunnel " Satisfied <br /> Stipulation No. 4(B) - Satisfied <br />