Laserfiche WebLink
-5- <br /> Stipulation No. 5 - Satisfied <br /> Stipulation No. 6 - (Revegetation Monitoring) - Not applicable to date <br /> Stipulation No. 6(B) <br /> Phase I - Inventory - Satisfied <br /> Phase II - Test Section Construction - Satisfied <br /> Phase III-A - Monitoring of Phase II - Ongoing w/Annual Reports <br /> (Phase III-B) - Material Balance Report due December 31 , 1987 <br /> Stipulation No. 7 - Satisfied <br /> Stipulation No. 8 - <br /> Phase I - Mapping - Satisfied <br /> Phase II - Test Section Construction - Satisfied <br /> Phase III-A - Monitoring - Ongoing w/Annual Reports <br /> Phase (III-B) - Material Balance Report - Due December 31 , 1987 <br /> Stipulations Nos. 9 and 10 - Numbers not used in Revised Findings Document <br /> Stipulation No. 11 - Satisfied <br /> From Technical Revision - Tunnel to Wash Plant Conveyor Approval Letter of <br /> June 28, 1984. <br /> Stipulation No. 1 - Satisfied <br /> Stipulation No. 2 - Satisfied <br /> Stipulation No. 3 - Satisfied <br /> Stipulation No. 4 - Due following construction of the conveyor system. <br /> Stipulations to Technical Revision of August 23, 1984 for placing coal <br /> processing waste on Rock Tunnel waste pile. <br /> Stipulation No. 10 - Satisfied <br /> Stipulation No. 11 - Satisfied <br /> Stipulation to Technical Revision for Light - Use Road Extension of April 20, <br /> 1985. <br /> Stipulation No. 1 - Accepted by Mid-Continent - Satisfied <br /> Stipulation to Minor Revision No. 1 - due by November 1986. <br /> "Stabilization of Sutey Topsoil Pile" <br />