My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (236)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (236)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:20:52 AM
Creation date
6/20/2012 1:58:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1993 Permit Renewals
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Training sessions will be held for Mid-Continent personnel at the <br /> time of plant installation, and a follow-up refresher session by <br /> H2O will be scheduled approximately 30 days after the plant goes <br /> on-line. <br /> Plant Operator(s) <br /> The preparation plant operates three shifts per <br /> day, five days per week. <br /> Plant superintendent Leif Erickson is <br /> responsible for the preparation plant, and will <br /> be responsible for proper functioning and <br /> maintenance of the water treatment plant. He <br /> supervises plant operators. <br /> There is a plant foreman or designated person <br /> in charge of every shift. As part of his <br /> regular duties, the plant foreman or person in <br /> charge makes a walk-through inspection of the <br /> plant, checking pumps, pipes, pressure <br /> differentials, and scheduling necessary <br /> maintenance. He will have the additional duty <br /> of making a walk-through inspection of the <br /> water treatment plant, checking for proper <br /> function of the coarse classifier, thicker, <br /> clarifier, pumps and filters. He will check <br /> the controls, monitor flocculation, and <br /> visually inspect overflow(s) for turbidity. <br /> He will supervise mixing and addition of <br /> flocculant and necessary maintenance or other <br /> work done to the system. In the event of <br /> problems with the system, equipment malfunction <br /> or necessary maintenance, it is the <br /> responsibility of the plant foreman or person <br /> in charge to determine the appropriate course <br /> of action and supervise its implementation. <br /> The duties of the plant lab technician include <br /> quality analysis and in-plant sampling of coal <br /> during the washing process. The lab technician <br /> works one shift per day, five days per week. <br /> The duties of the lab technician will be <br /> expanded to include water monitoring during the <br /> treatment process, and monitoring of the plant <br /> effluent. <br /> Testing with the turbidimeter will ordinarily <br /> be carried out by the plant lab technician, <br /> although plant foremen will be trained in the <br /> use of the hand-held turbidimeter. Testing <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.