My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (236)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (236)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:20:52 AM
Creation date
6/20/2012 1:58:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1993 Permit Renewals
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the preparations plant control room. <br /> The main instruments and control panel will be <br /> located adjacent to the clarifier and media <br /> filters. <br /> System Back-up Features <br /> In the event of a preparation plant shutdown, <br /> the treatment process is designed to operate <br /> independently. <br /> The 55-foot diameter thickener will provide a <br /> surge for accumulation of solids over a period <br /> of several days, allowing for storage during <br /> times when the preparations plant is idled. <br /> A valve box situated at the tunnel portal yard <br /> allows re-routing of flows from the mine to the <br /> pond series at 016. <br /> In the event that discharges from the mixed- <br /> media filters are in excess of allowable <br /> limits, the pumps to the mixed media filters <br /> can be deactivated. In that case, overflow <br /> from the surge tank would go into the overflow <br /> line, which would automatically route the water <br /> to the 001 four-pond series. This allows a <br /> short-term back-up treatment system which can <br /> be used as necessary to correct minor (those <br /> which can be quickly remedied) malfunctions in <br /> the plant, and/or while mine discharge flows <br /> are diverted to the 016 pond series. <br /> Mid-Continent is purchasing a hand-held <br /> turbidimeter which will allow us to check the <br /> suspended solids at various points in the <br /> system. This will allow us greater capability <br /> to monitor the performance of the various <br /> elements of the system, and the turbidity of <br /> the water coming in to the plant, as well as <br /> the TSS of the plant discharge water. <br /> Personnel/ QMrator(s) <br /> Preparation plant personnel are responsible for operation of the <br /> water treatment system. <br /> In addition, security personnel will be employed during weekends <br /> and holidays to monitor for signs of trouble. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.