Laserfiche WebLink
r <br /> The enure refuse pile wren appea~ to br `t^Vctur�!!, 15n,Jrld Tmcrc wan no <br /> ponding of water anywhere on the pile. No evidence of sloughing or settling <br /> was observed <br /> Rock Tunnel Waste Dlstiosal Facility <br /> At the time of inspection, the Rock Tunnel Waste Pile was being utilized <br /> only for the placement of cleanings from the lower ponds. A flat area was <br /> prer�ared on top of the pile in order to place these pond cleanings. No berms <br /> or incised pits were constructed to accept the pond cleanings. This <br /> practice prevented any possible ponding of wate- ()n tor) of fhp rile <br /> The trash pile located due east of the tunnel waste pile was receiving <br /> waste material from the mine This material is periodically pushed with a <br /> dozer and compacted, <br /> All diversion ditches and ponds were examined and found to be in good <br /> worr inq i:,rcler <br /> No evidence of structural instability was observed anywhere on the pile. <br /> I certify that the Coal Basin Sutey Coal Refuse and Rock Tunnel Waste <br /> Disposal facilities have been inspected to the best of my abilities and are <br /> in accordance with the designs approved by the Colorado Mined Land <br /> Reclamation Division, <br /> G REj <br /> vO�PgC4T1-11 <br /> oaAL E <br /> James Scott Jones, P.E. No. 24233 <br />