My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (239)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (239)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:24:14 AM
Creation date
6/20/2012 11:20:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1982 Technical Revisions Rock Tunnel Trash Pile
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mlw-CONTINENT RESOURCES, .NC. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> MID-CONTINENT RESOURCES,INC TELEPHONE <br /> 625 PLAINFIELD ROAD-SUITE 220 (303)963-2581 <br /> WILLOWBR00 K, ILLINOIS 60521 Twx <br /> February 6, 1986 910 929 6894 <br /> TLX <br /> «11,low �-� tr-;�ti 45-0724 <br /> Ms. Candace Thompson t.e, <br /> Mined Land Reclamation Division <br /> 423 Centennial Bldg. FEB 101986 <br /> 1313 Sherman St. <br /> Denver , Colorado 80203 <br /> Subject: Technical Revision - O 010. DURI. 07 wr� t�! ► ��..;,��.� <br /> Sutey Topsoil Pile Perimeter Ditch <br /> Dear Candace, <br /> We hereby request that the perimeter ditch encircling the Sutey <br /> refuse pile topsoil storage area be decreased in width from <br /> 15 feet to 8 feet to 10 feet. It has become apparent that due <br /> to moisture problems in the pile and the ensuing slumps , the <br /> outside perimeter ditch area has been encroached upon to the <br /> degree that in order to maintain a 15-foot, plus or minus ditch <br /> and berm, it would now be necessary to remove vegetation (trees <br /> and shrubs) and topsoil. Upon looking at the original design <br /> of the ditch/berm zone it is obvious that 15 feet is not necessary <br /> to maintain drainage. The pile dimensions are roughly 150 feet <br /> x 450 feet, or 55 ,000 cu. yds. (1. 55 acres) . <br /> Stipulation No. 12 (Pg 18, Sutey Finding document) : <br /> "The permittee is directed to construct a berm at least three <br /> feet in height around the LOWER end of the topsoil stockpile <br /> prior to construction of the pile . This berm must be placed <br /> a minimum of 15 feet from the toe of the topsoil stockpile. " <br /> It is apparent from the Stip. that the berm was not designed <br /> to maintain a 15-foot margin all around the pile, but to contain <br /> sediment draining down dip from the upper end to the lower end. <br /> We believe that an 8 to 10-foot wide tapered ditch <br /> P1L Dicer( r-oa�csr <br /> will more than suffice to contain any sediment the pile will <br /> produce. Please call if you have any questions. <br /> Sincerely, <br /> DWBowman:ms <br /> Copy: Mr. George Wear <br />
The URL can be used to link to this page
Your browser does not support the video tag.