My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (239)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (239)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:24:14 AM
Creation date
6/20/2012 11:20:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1982 Technical Revisions Rock Tunnel Trash Pile
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br /> MID-001;TI\E`T RESOURCES. INC. <br /> 201 Centennial St.Suite 406 <br /> Glenwood Springs. Colorado 81601 <br /> 0)3)945-4958 <br /> February 12, 1986 F _� l00 <br /> Candace Thompson <br /> Mined Land Reclamation Division <br /> ' 1313 Sherman Street <br /> 423 Centennial Building <br /> Denver, CO 80203 <br /> Subject : Sutey Topsoil Pile Permit No . C-017-81 <br /> Dear Candace: <br /> This letter is to address the stability problem on the north <br /> side of the Sutey coal refuse area main topsoil pile . Our <br /> efforts in 1985 were unsuccessful due to the excessive <br /> amount of precipitation (over 40") which fell throughout the <br /> year . The topsoil pile and adjacent access areas never <br /> dried out . We would propose a schedule for 1986 that would <br /> include the following : <br /> The excavation of the material directly adjacent to the <br /> slump area and the lane back of the slope in that area <br /> within 30 days of access to the topsoil pile (estimate <br /> August 1st) . If for similar reasons as last year (above <br /> normal precipitation) the pile is not accessible by normal <br /> equipment such as track loaders , backhoes , or caterpillar <br /> tractors we will bring in a drag line to excavate the necessary <br /> material . <br /> Please contact me if you have any questions . <br /> Sincerely, <br /> A 6� <br /> Doug owman � <br /> Environmental Coordinator <br /> DB : rm <br />
The URL can be used to link to this page
Your browser does not support the video tag.