Laserfiche WebLink
were evident at the time of inspection; however, remedial steps were <br /> being taken to correct these problem areas. This included the re-grading of <br /> the erosion areas and contouring the surrounding area to prevent long <br /> unbroken flows of water across the face of the pile. <br /> I certify that the Coal Basin Sutey Coal Refuse, Rock Tunnel Waste <br /> Disposal and Old Refuse Pile facilities have been inspected to the best of <br /> my abilities and are in accordance with the designs approved by the <br /> Colorado Mined Land Reclamation Division. <br /> c^�gSC <br /> James Scott Jones, P.E, No. 24233 -z' <br /> f <br />