My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (254)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (254)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:55:34 AM
Creation date
6/20/2012 10:06:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1994 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 15, 1994 Backfilling and grading operations at Mine 4 <br /> will be complete. Topsoil redistribution at <br /> Mine 4 will be complete. ($6425) <br /> October 31, 1994 Surface facilities removal down to ground <br /> level will be complete on the entire mine <br /> site. ($916, 583) <br /> Reclamation of the Old Refuse Pile will be <br /> completed. This includes final grading, <br /> topsoil redistribution, establishment of all <br /> required diversions with appropriate channel <br /> lining and seeding and mulching ($64 603) <br /> Reclamation of the Sutey Refuse Pile will be <br /> completed. This includes compaction of all <br /> refuse material, final grading, topsoil <br /> redistribution, installation of terraces, <br /> diversions and toe drains (as required) , and <br /> seeding and mulching. ($74, 169) . <br /> Reclamation of the Rock Tunnel Waste Pile will <br /> be completed.This includes final grading, <br /> topsoil redistribution, installation of <br /> terraces and a clean water diversion, and <br /> seeding and mulching.' Reclamation of the <br /> upper portion of the pile may be delayed, with <br /> DMG approval, if material from the pile is - <br /> needed for reclamation work elsewhere on the <br /> mine site. ($75,768) <br /> Seeding and mulching on the outslopes and <br /> portal benches at Mine's 3, 4, and 5 will be <br /> complete. ($94, 384) <br /> Reclamation of the Mine 3 and 4 roads <br /> (reducing road width, regrading, ripping, <br /> topsoil redistribution and seeding) will be <br /> completed with the exception of any creek <br /> crossings which are needed for access to the <br /> Mine 3 and 4 areas. ($161,710) <br /> Seeding and mulching of the Mine 5 road will <br /> be complete. ($57,361) <br /> Reclamation of the reaffected area of coal <br /> adjacent to Coal Creek at Mine 5 will be <br /> complete. This includes removing coal <br /> material from the creek channel, hauling this <br /> material to the Sutey Refuse Pile, salvaging <br /> and replacing topsoil in this area, and <br /> installing contour furrows on the reclaimed <br /> area. ($184,806) <br />