My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (254)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (254)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:55:34 AM
Creation date
6/20/2012 10:06:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1994 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> Maintenance of sediment control systems, <br /> roads, reclaimed areas, and any mine-related <br /> disturbance to performance standards in the <br /> mine permit and/or Colorado regulations. <br /> ($8160) <br /> January 1, 1995 $887,717. 00 shall be available for tasks to be <br /> completed by July 30, 1995. <br /> July 30, 1995 Reclamation of the Rock Tunnel pad area will <br /> be completed. This includes backfilling and <br /> grading of disturbed areas, elimination of the <br /> highwall, sealing and backfilling the portals, <br /> redistribution of topsoil, establishment of a <br /> stable drainage system for routing mine water <br /> discharge into Dutch Creek. , and seeding and <br /> mulching. ($57, 306) <br /> Realignment and channel lining of the clean <br /> water diversion around the Sutey Refuse Pile <br /> will be completed. ($272,708) <br /> October 31, 1995 Reclamation of the Mine 1 and 2 portals will <br /> be completed. This includes backfilling and <br /> grading of portal openings and benches, and <br /> seeding and mulching all disturbed bench and <br /> outslope areas. ($49,046) <br /> Installation of a permanent channel routing <br /> Dutch Creek through the facilities area will <br /> be complete. ($206,536) <br /> Backfilling and grading of the facilities area <br /> will be complete. This includes removing <br /> and/or placing all coal materials in <br /> designated areas. Topsoil redistribution in <br /> the facilities will be complete. Seeding and <br /> mulching of the facilities area will be <br /> complete. ($234, 031) <br /> Reclamation of the Mine 1 road (reducing road <br /> width, regrading, ripping, topsoil <br /> redistribution and seeding) will be completed <br /> with the exception of any creek crossings <br /> which are needed for access to the Mine 1 <br /> area. ($56,415) <br />
The URL can be used to link to this page
Your browser does not support the video tag.