My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (251)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (251)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:50:16 AM
Creation date
6/20/2012 10:04:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1993 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
some acreage at the mine sites as steep as 2 . OH: 1 . OV . Past <br /> experience has shown the costs for contracting this work to be <br /> roughly $700 per acre for flat areas that can be drill seeded and <br /> $1150 per acre for those areas that require hydroseeding and <br /> mulching . These costs include all seed, mulch, fertilizer and <br /> labor . <br /> Costs : Hydroseeding and Mulching <br /> 12 . 0 acres x $1150 per acre = $13, 800 . <br /> Costs : Conventional Drill Seeding and Mulching <br /> 77 . 2 acres x $700 per acre = $54 040 . <br /> Total Costs : $67 , 840 . <br /> i ) Dragline Pond Cleaning <br /> Although it is not known if pond cleaning will actually be <br /> required, an assumption will be made that it will be needed at <br /> certain ponds and the dragline that has been contracted in the past <br /> will be used at a cost of $100/hr for 5 . 5 days . <br /> 5 . 5 days x 8 hrs/day x $100/hr = $4 , 400 <br /> j ) Portal Seal Crew <br /> The portal seal crew will reclaim all other portals on the site <br /> with the exception of the rock tunnel portals . This contract has <br /> already been set at a cost of $50 , 000 , which is not included in <br /> this estimate for the 1994 reclamation season . The portal sealing <br /> should be completed according to the time frames shown in the <br /> schedule so that no interference occurs with road reclamation . <br />
The URL can be used to link to this page
Your browser does not support the video tag.