Laserfiche WebLink
k) Concrete Foundation Removal <br /> Certain foundations at Mines #3 and #4 will need to be blasted <br /> prior to backf i 11 i ng and grading. This should be done on a contract <br /> basis . A preliminary estimate for the cost of this work is $2500 . <br /> Reclamation Supervision <br /> This cost includes supervising a large portion of the actual work <br /> and interacting with various agencies on the work progress . It has <br /> not yet been decided how this matter will be handled, therefore a <br /> very approximate estimate of $26 ,000 is given for this item. <br /> 3) Reclamation Cost Summary <br /> Estimate 1 (use owned equipment) Estimate 2 (contract all work ) <br /> Cat D8N $47 , 600 $83, 312 <br /> Scraper $20 , 213 $20 , 213 <br /> Cat 980 $14 , 380 $14, 380 <br /> 16G Grader $20 , 059 $38 ,851 <br /> 10 YD Trucks $16 , 000 $16 ,000 <br /> Util . Crew $27 , 600 $27 , 600 <br /> Revegetation $67 , 840 $67 ,840 <br /> Dragline $ 4 , 400 $ 4 ,400 <br /> Fabric Purch . $ 4 , 000* $ 4 , 000 <br /> Concrete Rem. $ 2 , 500 $ 2 , 500 <br /> Supervision $26 , 000 $26 , 000 <br /> --------------- ----------------- <br /> Total $250 , 592 $305 , 106 <br /> * This is erosion control fabric needed for the Sutey Refuse Pile <br /> surface water control system. <br />