Laserfiche WebLink
h) Four Man Utility Crew <br /> A crew of three utility workers and one leader/worker is needed to <br /> perform manual labor on final erosion control measures for road <br /> reclamation and other miscellaneous tasks that arise during the <br /> reclamation process . Gully repair , culvert plugging and numerous _ <br /> other items will be performed. <br /> Each worker will be contracted at the rate of $11 . 00/hr including <br /> benefits . The leader/worker will cost $13. 00/hr . Total cost per <br /> hour for the crew is $46 . 00/hr . <br /> Costs: <br /> 15 weeks x 40 hrs/week x $46 . 00/hr = $27 , 600 <br /> i ) Mulching and Seeding Crew <br /> The following areas will need to be reseeded , mulched and <br /> fertilized prior to the end of the 1994 construction season : <br /> Sutey Pile 17 . 0 acres <br /> Mine #3 7 . 7 acres <br /> Mine #4 7 . 7 acres <br /> Road to Mine #5 24 . 0 acres ( 19700 ft long x 53 feet wide) <br /> Road to Mine #4 17 . 9 acres ( 15800 ft long x 49 . 4 ft wide) <br /> Road to Mine #3 14 . 9 acres ( 13400 ft long x 48 . 4 ft wide) <br /> ------------------------------------------- <br /> Total : 89 . 2 acres <br /> The different road widths also include varying distances of cut and <br /> fill slope areas that will be revegetated . <br /> Most of this area to be revegetated is flat although there will be <br />