My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (251)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (251)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:50:16 AM
Creation date
6/20/2012 10:04:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1993 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) Cat 980 Loader <br /> As seen on the schedule, the 980 loader is used to load topsoil <br /> into the ten yard trucks for reclamation of the mine bench areas <br /> and certain bad spots on the roads . One week is allocated for each <br /> of the roads and bench areas for Mines #3 and #4. <br /> Owning cost: $38 . 14/hr (assumes new machine) <br /> Operator cost: $21 . 58/hr ( includes all benefits) <br /> Operating cost: $30 . 16/hr ( includes fuel , oil , maintenance) <br /> Estimate 1 : (use 980 at mine, do not include owning cost) <br /> 4 weeks x 40 hrs/week x $51 . 74/hr = $8 , 278 <br /> Estimate 2 : same as above plus owning cost (assumes paying a <br /> contractor) . <br /> 4 weeks x 40 hrs/week x $89 . 88/hr = $14, 380 <br /> d) Cat 16G Road Grader <br /> The roads will initially be ripped by the D8N dozer , thus <br /> facilitating the job of the 16G in final grading . Since little <br /> final grading work will be needed , it is estimated that two weeks <br /> will be needed for each road . An extra week is added for each road <br /> as contingency . <br /> Owning cost: $52 . 20/hr (assumes new machine) <br /> Operator cost: $21 . 58/hr ( includes all benefits) <br /> Operating cost : $34 . 14/hr ( includes fuel , oil , maintenance) <br /> Estimate 1 : (use 16G at mine, do not include owning cost) <br /> 9 weeks x 40 hrs/week x $55 . 72/hr = $20 , 059 <br />
The URL can be used to link to this page
Your browser does not support the video tag.