activities are geared toward minimizing erosion of disturbed lands <br /> in order to minimize sediment delivery to Coal and Dutch Creeks. <br /> Reclamation is being accomplished to promote the anticipated post <br /> mining land uses of recreation, grazing and wildlife habitat. <br /> During the 1995 and 1996 reclamation seasons, the Division, through <br /> independent contractors, has completed eight reclamation projects. <br /> These include reclamation of portions of the Old Refuse Pile, the <br /> Sutey Refuse Pile, Mine 3 , Mine 4 in 1995. In 1996 reclamation of <br /> the Rock Tunnel, Roads E, F, G (the haul roads in the northern <br /> portion of the Basin) , Rock Tunnel Waste Dump, and Mines 1 and 2 <br /> was accomplished. Over seeding of some reclaimed areas has <br /> occurred, and mine site maintenance has also been accomplished. <br /> These projects have resulted in the reclamation of approximately <br /> 140 acres. <br /> We have also been conducting a number of revegetation experiments <br /> on the steep slopes below some of the mine benches. We have seeded <br /> some of the slopes using conventional hydro seeding techniques, <br /> construction of small log benches anchored to the slopes, <br /> application of spray-on erosion control materials, and the <br /> mechanical creation of small depressions on the slopes. We have <br /> usually done this revegetation with commercially available seed, <br /> however it has been observed that two native plant species do <br /> fairly well on these areas. Seed from a native grass and a shrub <br /> was collected late last summer, and was replanted in selected <br /> areas. <br /> Cursory observation of the reclaimed areas indicates that the 1995 <br /> projects are doing well. Revegetation is beginning to become <br /> established at these areas, and generally, the drainage patterns <br /> which we hoped to achieve are functional. It is still early to <br /> accurately assess the success of 1996 reclamation work. Vegetation <br /> is beginning to emerge at the four 1996 project areas, and these <br /> areas generally appear to be reacting as intended to snow melt and <br /> spring rains. The roadways which were reclaimed showed little <br /> signs of surficial erosion. Some slumping has occurred in three <br /> areas along the reclaimed roads. We are assessing the reclaimed <br /> roads, and will make changes as necessary to alleviate any problems <br /> with the reclamation practices. We will be doing a comprehensive <br /> field review of the reclaimed roads in order to glean as much <br /> information as possible from the work which we have accomplished <br /> before proceeding with additional road work. It has been noted <br /> that the steep slope areas of Mine 1 which were mechanically <br /> roughened in 1996 are showing encouraging results as far as growth <br /> is concerned. It is hoped that the growth pattern will persist <br /> over the summer. <br /> In 1997 we have scheduled two reclamation projects. The Warehouse <br /> Vicinity Project will accomplish reclamation of the Warehouse, two <br /> adjacent coal stockpile yards and the overland conveyor corridor, <br /> as well as miscellaneous adjacent areas. We will also accomplish <br /> 2 <br />