Estimate of DMG Reasonable Costs for Work Performed <br /> The table below should be compared to the costs in the previous table for DMG work. The previous table <br /> assumes credit for areas done by the DMG according to the bond amount, not according to what was actually <br /> done. The following table assumes a reasonable cosst for what the DMG has actually done for each of the tasks. <br /> In some cases, the costs are identical and in other cases, the costs are drastically different. <br /> Task# Task Description Reasonable Comments <br /> Cost <br /> 1 Site Revegetation $90,291 This cost is based on the fact that the DMG has <br /> reclaimed approximately 128.4 acres of mild <br /> slopes at a cost of S599 per acre and 4 acres of <br /> steep slopes at a cost of$3345 per acre, resulting <br /> in a reasonable cost of$90291. It is not known <br /> why the DMG is using hydroseeding and <br /> mulching on all the mild areas instead of drill <br /> seeding and crimp or broadcast mulching. The <br /> cost of S599 per acre for drill seeding/mulching is <br /> reasonable and should be used. <br /> 2 Structural $43,673 This cost is approximately accurate although <br /> Demolition MCR got bids for considerably less when <br /> considering the same work. <br /> 3-7 Mine Bench $15,000 The credit of only $15000 is given since the <br /> Backfilling amount of material moved is much less than that <br /> shown in the plans and the bond calculations. <br /> Basically, only the portal tunnels were covered up <br /> at all mine areas. <br /> 8 Backfill Prep $0 This work has not yet been done. <br /> Plant Area <br /> 9 Finish Grade the $17,926 Full credit is given for this task since grading was <br /> Entire Site done on the roads and the portal areas. <br /> 10 Sediment Pond $0 No work for this task has been done. <br /> Removal <br />