My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (234)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (234)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:17:12 AM
Creation date
6/19/2012 2:59:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1997 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2 Demolition Costs <br /> The approved reclamation plan contains a list of structures and foundations to be removed after reclamation. <br /> All structures have been removed at all locations except for the foundations in the prep plant area. The total <br /> cost for this task is $765,405. The total cost for foundation removal (included in the previous amount) is <br /> $194,692. The foundation estimate from the 1991 bond does not include details for the concrete at all sites, <br /> therefore, an estimate must be made of those foundations which have been removed as part of the S194.692 <br /> cost. . From earlier photos of the portal areas, the rock tunnel area, the warehouse area and the conveyor <br /> leading to the prep plant, it is estimated that approximacel, :-`0% of the foundations on the entire site have been <br /> removed. The prep plant still contains the majority of the large foundations on the site. <br /> Therefore, the remaining foundation removal cost is 75°o of S 194,692 = S 146,019 <br /> Since all other buildings and foundations have been removed, the credit for all work done for this task is <br /> $765,405 - $146,019 = S619,386. <br /> AM King has been responsible for the removal of all buildings on the site while the DMG has removed <br /> foundations at the portal areas and in the upper yard%warehouse area including conveyor foundations. <br /> Therefore, the MCR work is calculated as S4124 for Mine =5 buildings — S5000 for foundations = $9124. <br /> The DMG work is calculated for foundation removal as 25%of$194,692 or $48,673 - S5000 (by MCR)_ <br /> $43,673. <br /> All remaining work done by King is calculated by the total bond for this task less the work done by MCR and <br /> the DMG and the remaining foundation work. This is therefore $765,405 - $146,019 - $$43,673 - $9,124 = <br /> $566,589. <br />
The URL can be used to link to this page
Your browser does not support the video tag.