My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (232)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (232)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:11:54 AM
Creation date
6/19/2012 2:59:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1998 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HUNTSMAN PROJECT (1998) <br />The following is compiled from a DRAFT copy of an Invitation and Bid for the Huntsman <br />Project. <br />PROJECT WORK DESCRIPTION <br />PROJECT OVERVIEW <br />The goal of this project is to enhance the stability of the north facing slope of the Old Refuse Pile <br />by creating a slope which does not exceed an gradient of 2H:1 V. While a small amount of filling <br />is involved, generally the slope will be excavated to achieve the desired slope angle. Refuse <br />excavated from the Old Refuse Pile will be transported to a designated disposal area located at the <br />base of the north facing slope behind the former location of the Wash Plant. Upon completion of <br />cut, fill and disposal activities, the north slope of the Old Refuse Pile will be topsoiled and <br />revegetated. Silt fence may be erected at the base of the pile to minimize sediment transport from <br />the site. Map 3, Project Area, depicts the Old Refuse Pile, the disposal facility, topsoil pile <br />location and other features. <br />Volumes distances and areas stated in this document are estimations only. CONTRACTORS <br />are responsible for verifying all estimations prior to bid submittal. <br />WORK TASKS <br />The tasks included in this project are as follows: <br />Task 1: Mobilization and Demobilization <br />Task 2: Earth Work <br />Task 3: Topsoil Placement <br />Task 4: Revegetation <br />Task 5: Equipment Rental <br />Task 6: Silt Fence <br />Task 7: Under Drain Construction <br />Task 8: Tree Planting <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.