Laserfiche WebLink
The reclamation schedule and estimated cost by project are as follows: <br />PROJECT <br />ESTIMATED COST CONSTRUCTION YEAR <br />ROADS A, B, C, D, HUNTSMAN (1) $207,461 1999 <br />ROCK TUNNEL VICINITY $51,666 1999 <br />FACILITIES AREA $218,490 1999 <br />FACILITIES AREA DEMOLITION $108,500 1998 <br />HUNTSMAN PROJECT $200,000 1998 <br />DUTCH CREEK DIVERSION $115,000 1998 <br />MINE MAINTENANCE (2) $145,018 1998 / 1999 <br />SEED BID (2) $15,790 1998 / 1999 <br />SOIL ANALYSIS (2) $5,250 1998 / 1999 <br />TREE PURCHASE AND PLANTING (2) $59,703 1998 / 1999 <br />CONTAMINATED SOILS DISPOSAL $5,876 1998 / 1999 <br />CONTAMINATED SUBSURFACE DISPOSAL $6,811 1998 / 1999 <br />REMEDIATE LEACH FIELDS (3) $5,258 1998 / 1999 <br />(1) The cost for the entire project is included here, however only Road A is located on privately <br />held lands. <br />(2) In order to conserve funds, and to take advantage of economies of scale, these tasks will be <br />completed in conjunction with other projects occurring at Coal Basin; the costs for privately held <br />properties alone are not included here. <br />(3) These tasks will be completed in conjunction with other projects when and if the need arises. <br />These costs are derived from the Division's Reclamation Cost Estimate Summary (revised <br />February 3, 1998). In order to avoid confusion, the five percent additional for change orders, <br />inflation and construction increases has been added to each project total. <br />In his April 22, 1998 correspondence, Robert Delaney requested that, in the absence of a land <br />exchange with the Forest Service, certain buildings and structures not be removed during <br />reclamation. Specifically, Mr. Delaney requested that the Lamp House, Road A, power lines from <br />the Wash Plant vicinity to the Lamp House, Prep Plant Water Tank, the existing metal building <br />located to the north west of the Wash Plant vicinity and one or more wells not be disturbed. He <br />has also requested that road access, presumably through the Wash Plant vicinity, be maintained <br />and that provision be made to accommodate a parking lot. <br />Reclamation construction in 1998 will not impact the Lamp House, or the power lines. It has <br />2 <br />