My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (232)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (232)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:11:54 AM
Creation date
6/19/2012 2:59:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1998 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resources' and the Trustee's attorney has indicated that use of this soil would be acceptable, <br />provided that sufficient topsoil exists to accomplish reclamation of the adjacent privately held <br />properties. I am providing the following information in order to address this concern. Due to <br />contracting time frames, a final decision regarding use of the topsoil must be made in the <br />immediate future. Please contact me as soon as possible if you have questions regarding the <br />topsoil numbers. <br />The following Topsoil Volume Figures are derived from Table 1 -1; Technical Revision 21 <br />submitted by Mid - Continent Resources in August, 1991. <br />Stockpile Location Stockpile Volume (yd <br />Main Sutey 65,600 <br />New Sutey 24,000 <br />Sutey Access Road 2,500 <br />Overland Conveyor 8,300 <br />Subtotal 100,400 <br />Topsoil Used (Estimate; 1995 Refuse Pile Reclamation Project) <br />44,000 <br />Balance Available 56,400 <br />The following amounts of topsoil needed for future reclamation were derived from the permit <br />application requirements and from measurements made from site maps. Depth of soil to be <br />applied at each area is 0.5 feet. <br />Reclamation Location Topsoil Volume Needed (yd <br />Upper Sutey Access Road 1,028 <br />Lower Sutey Access Road 1,056 <br />Belt Line Road 250 <br />Old Refuse Pile Access Road 1,926 <br />Yard Area (17 ac.) 13,713 <br />Old Coal Storage Area 1,613 <br />Old Refuse Pile Channel 1,852 <br />Subtotal 21,438 <br />Huntsman Project 8,550 <br />Total Needed 29,988 <br />Potential Surplus 26,412 <br />
The URL can be used to link to this page
Your browser does not support the video tag.