Laserfiche WebLink
If a 15 % error is injected into all calculations ie: potentially available soil is 15% less than <br />estimated by Resources (85,340 yd amount of topsoil used in 1995 by the Division is 15% <br />higher than estimated (50,600 yd and the total volume still needed is 15% greater than currently <br />estimated (34,486 yd sufficient topsoil is still available to accomplish the remaining tasks. <br />Based upon the surveys accomplished by Resources and provided to the Division in 1991, it is <br />apparent that sufficient topsoil remains in the Sutey and Overland Conveyor topsoil stockpiles to <br />accomplish topsoil application at the Huntsman Project area, without realizing a shortfall at the <br />privately held properties requiring topsoil application as part of the reclamation process. <br />Therefore, the Division requests that you recommend approval of the use of this topsoil in order <br />that the Huntsman Project may be accomplished in 1998. <br />c: \sgr \hntmnsol.wpd <br />cc: Michael Long <br />David Bucknam <br />Cheryl Linden <br />