My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (230)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (230)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:10:30 AM
Creation date
6/19/2012 2:58:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1999 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) Dutch Creek Diversion - $90,000 <br /> Dutch Creek had long ago been placed in a flume where it emptied into <br /> Coal Creek. The flume was failing and significant erosion would result when it <br /> failed. Therefore, DMG applied for and received monies from the Office of <br /> Surface Mining to reroute the creek. This task was accomplished in 1998. <br /> OSM designed the new channel as a two-stage compound channel to <br /> accommodate the normal high flow as well as major event flow. Constructing <br /> the channel involved moving about 35,000 cubic yards of material (some more <br /> than once) to establish the new channel, and armoring the channel with 3,750 <br /> cubic yards of riprap. In 1994, 1 paid a contractor$17.20 per cubic yard to place <br /> riprap along an existing stream. Placing 3,750 cubic yards of riprap for $17.20 <br /> per cubic yard would have accounted for about $65,000, which would have left <br /> $25,000 to move 35,000 cubic yards of material. This project also appears to <br /> have been done very cost effectively. <br /> 2) Huntsman Project (slope reduction of Old Refuse Pile above Coal Creek) - <br /> $209,000 <br /> The Old Refuse Pile was placed at a steep angle immediately adjacent to <br /> Coal Creek. As such, it was eroding into the Creek and was threatening to <br /> mass-fail into the creek. The DMG applied for and received monies from the <br /> Inactive Mined Land Section of DMG (IML) to reduce the slope of the pile where <br /> it was threatening to fail into the creek. <br /> The task consisted of moving 60,000 cubic yards of refuse a distance of <br /> approximately 0.3 mile from the Old Refuse Pile to the Warehouse Area, <br /> including sediment control, compaction, and revegetation. Moving material that <br /> far, and compacting it, for $3.50 per cubic yard is quite cost effective. The <br /> project I managed in 1998 moved material (albeit a lesser quantity) a shorter <br /> distance with no compaction for $5.00 per cubic yard. <br /> 9 <br />