Laserfiche WebLink
Revised Chapter V, Pages 20 and 21 <br /> The Division had previously indicated that reclamation of the Mine#1 dump would be required <br /> during this year(1992). <br /> The Division referred to plans for reclamation of the Mine#1 dump which had been submitted <br /> previously. In reviewing these plans, we note that at that time, it had been anticipated the <br /> dump would contain more material than it presently does. There is no environmental or <br /> reclamation benefit to hauling additional materials to the site merely to achieve the contours <br /> sketched out previously. Accordingly, we have indicated the actual present contours and <br /> propose these as the final configuration of the reclaimed trash area. We are in need of some <br /> additional soil material to use as a growth medium for vegetation and propose to use the <br /> available soil material cleaned from ditches, b.a.t. ponds, and excavated during road <br /> maintenance over the course of the summer. We further propose to use the same seed mix <br /> as is being proposed (PR-2) for the roads. <br /> The proposed revision also suggests a schedule over the next several years for completion of <br /> clean-up and repairs at Portal Benches#3,#4 and #5. We believe this to be a realistic <br /> schedule. <br /> Yours truly, <br /> Diane Delaney <br /> Mid-Continent Resources <br /> TR-23 <br /> 6192 <br />