Laserfiche WebLink
:TENT BY:Sunnyside Gold CorP -23-93 03:21PM 30338---10-) 303 832 8106 # 4 <br /> Responses to Division Concerns <br /> Pa go 3 <br /> Table 2 <br /> 1 2 <br /> Property Line Amer i can Tunnel Flow <br /> Date Flume (MGD) Portal Flume (MGD) Difference (MGD) <br /> 24 Mar 92 1.29 2.23 9. 94 <br /> 19 May 92 1.35 2.27 0. 92 <br /> 17 Jun 92 1.41 2.04 0.63 <br /> 09 Jul 92 1.49 2.17 0.68 <br /> 23 Jul 92 1.45 2.20 0. 75 <br /> 14 Aug 92 1.66 2.33 0.67 <br /> 28 Sept 92 1.55 2. 39 0. 64 <br /> 04 Jan 93 1.60 2.13 0.53 <br /> 12 Mar 93 1.50 2.17 0.67 <br /> 20 Apr 93 1.44 2.22 0.78 <br /> Average 1.47 2. 22 0. 75 <br /> 1 The Property Line flume is located at 6127' from AT-P3. it is <br /> a 24 inch Parshall flume installed in the drainage ditch. <br /> 2 The American Tunnel portal flume is located in the concrete <br /> ditch between the American Tunnel portal and the reagent feed <br /> building. It is a 9 inch Parshall flume. <br />