My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-09-23_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1993-09-23_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 6:43:06 PM
Creation date
6/15/2012 6:41:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
9/23/1993
Doc Name
Adequacy Issues
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT BY:Sunn95ide Gold CorP n-23-93 03:21PM 30338---104 303 832 8106 # 3 <br /> Responses to Division Concerns <br /> Page 2 <br /> Table 1 provides a comparison of actual footages <br /> (referenced from AT-P3) to the "track repair footages" <br /> referenced in the Simon Hydro-Search report (February ll, <br /> 1992) . AT-P3 will be used as the origin (distance = 01) <br /> for all future footage references in the American Tunnel. <br /> b) Flow from the Sunnyside Mine in comparison to flow from <br /> the Amer i can Tunnel portal. <br /> The flow that originates on SGC property (Sunnyside Mine) <br /> as compared to the total flow from the American Tunnel <br /> portal has been monitored periodically since March, 1992, <br /> Flow measurements were taken from Parshall flumes <br /> installed at convenient locations close to the property <br /> line and outside the portal. Using a straight arithmetic <br /> average or a time weighted average, 66 - 671 of the <br /> American Tunnel flow originates from the Sunnyside Mine <br /> (SGC property) and would be impounded by the proposed <br /> bulkhead. <br /> c) proposed bulkhead site in relationship to Sunnyside Mine <br /> workings. <br /> SGC has not developed underground workings (le rock <br /> excavations) ou�tb e_ of the proposed bulkhead site. The <br /> 0700 runaround acid its flow contribution is inb a the <br /> proposed bulkhead site with only undeveloped tunne ing <br /> downstream of the proposed bulkhead. The reference point <br /> discussion in Part 1 a) and Table 1 explain the reason <br /> for confusion as to the location of the 0796 runaround in <br /> relationship to the bulkhead site (See Figure 1, page <br /> 15) . <br /> TABS 1 <br /> AMERICAN TUNNEL - DISTANCE REFERENCE CONVERSION (Feet) : <br /> Simon Hydro-Search <br /> (February 11, 1992) <br /> "Track Repair rootage" AT-P3 = 0 Comments <br /> 8159 10080 <br /> 7350 9145 <br /> 8157 property line <br /> 8127 flume <br /> - 7950 bulkhead site <br /> 6499 7852 <br /> 3429 3976 <br /> 2700 3226 <br /> 2490 2941 <br /> 0 -1 <br /> ' This site is in the concrete ditch between the portal and <br /> reagent feed building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.