My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (206)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (206)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:29:16 AM
Creation date
6/14/2012 10:55:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR, and shall conform to the specifications of Task 5, Outslope <br /> Protection, for those steep slopes designated for application of the BF1vI. <br /> The CONTRACTOR will supply the fertilizer (commercial), mulch, and equipment for, <br /> fertilizer application, seeding and mulching. Revegetation efforts will occur on <br /> aqpproximatelX nine (9) acres, which includes outslopes on the north and east flanks of <br /> Mine 4, including the loadout pad area slope, and the east facing outslopes along the <br /> upper portions of the Road C corridor. <br /> Hand broadcast application of seed is prefeicred, however hydro se, ding of the slopes <br /> is acceptable. <br /> If hydro seeding is selected to be employed on the slopes designated for application <br /> of the bonded fiber matrix, the seed will be applied immediately prior to, and <br /> separately from, installation of the BFM described in Task 5, Outslope Protection. <br /> Seed application rate will be at the rate specified in Table 1, Outslope Seed Mixture, <br /> for both hand broadcast and hydro seeding applications. <br /> Measurement and Payment <br /> Measurement and payment for this Task will be as per Revegetation Specification <br /> 20.0. Revegetated areas will be measured to the nearest 0.1 acre and paid at the unit <br /> price bid on the Bid Schedule Items 4a and 4b. The price bid shall include all costs for <br /> labor, materials, equipment and all other items necessary for revegetation as <br /> described in these specifications. <br /> TASK 5 OUTSLOPE PROTECTION <br /> CONTRACTOR shall hydraulically apply a bonded fiber matrix (BFM) that, upon <br /> drying, shall adhere to the soil 'in the form of a continuous, 100% coverage <br /> biodegradable erosion control blanket. Application of the BFM will occur on <br /> approximately nine (9) steep slope acres. <br /> The bonded fiber matrix shall be comprised of long strand thermal mechanical <br /> defibrillated wood fibers. The wood fibers (>88%total volume by weight) shall be <br /> held together by non-toxic tacWiers (minimum 8%) and mineral bona:ng agents <br /> (<2%) which, upon drying, become insoluble and non-dispersible. ?'he matrix which <br /> forms shall be designed, tested and proven to perform in a manner equal or superior <br /> to biodegradable erosion control blankets. Documentation of testing at an industry <br /> recognized laboratory shall be provided which demonstrates superior performance <br /> as measured by reduced water runoff, reduced soil loss and better plant germination <br /> as compared to erosion control blankets. The formed matrix shall meet the following <br /> performance requirements: <br /> 1? <br />
The URL can be used to link to this page
Your browser does not support the video tag.