Laserfiche WebLink
FOR SLOPES FLATTER THAN 3H:1V QEstimated 17 ACRES): <br /> - It is preferred that these areas be drill seeded using a grassland drill. See Section 20.3 <br /> (Drill Seeding) of the Revegetation Specifications, attached. All seed drilling and <br /> crimping operations will be operated on contour. Broadcast application of seed may be <br /> permissible with prior approval of the PROJECT MANAGER. Seed application rate will <br /> be double the drill seed application rate (Table 1, Mine Site Seed Mixture) for broadcast <br /> seeding applications. <br /> Measurement and Payment <br /> Measurement and payment for this Task will be as per Revegetation Specification 20.0. Revegetated <br /> areas will be measured to the nearest 0.1 acre and paid at the unit price bid on the Bid Schedule Item <br /> 10. The price bid shall include all costs for labor, materials, equipment and all other items necessary for <br /> revegetation as described in these specifications. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction activities and <br /> ensure that each work item is completed and constructed to design specifications. The PROJECT <br /> MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.) on weekdays. <br /> Inspections will not be scheduled on weekend days or holidays without prior approval of the PROJECT <br /> MANAGER. It is the Contractor's responsibility to schedule inspections with the Project Manager so as <br /> not to delay the work. The following items must be observed and approved by the PROJECT MANAGER <br /> before proceeding with additional work: <br /> 1. Completion of demolition activities; <br /> 2. Removal of all coal fines to the base of the B and M stockpiles backwalls; <br /> 3. Completion of all rolled dips; <br /> 4. Completion of all contour furrows; <br /> 5. Completion of drainage channels; <br /> 6. Completion of seedbed preparation prior to seeding. <br /> ADDITIVE ALTERNATE <br /> As an alternative to Task 8 b, construction of a lined channel segment, construction of a rip rapped <br /> channel segment will be considered. Construction of a rip rapped channel segment is NOT <br /> guaranteed, but may be constructed in lieu of the lined channel segment only at the direction of the <br /> PROJECT MANAGER. If constructed, the rip rapped channel segment will take the place of the lined <br /> portion of Stockpile B channel, Segment two. <br /> 18 <br />