Laserfiche WebLink
TASK I MOBILIZATION AND DEMOBILIZATION <br /> This task shall comply with specification 1.0, Mobilization/Demobilization, attached. <br /> TASK 2 DEMOLITION <br /> For purposes of the demolition task, all concrete structures located between the North Fork of Dutch <br /> Creek east to the eastern most portion of the Warehouse area adjacent to Road A are subject to the <br /> requirements of this task. <br /> There are two overall objectives of the demolition task. The first is to demolish concrete and block wall <br /> building remnants and foundations, conveyor foundations, asphaltic pads and similar materials which <br /> are located within the work areas. The second objective is to remove the rubble produced by the <br /> demolition process to designated disposal sites for burial. <br /> Past demolition experience at Coal Basin indicates that substantial quantities of rebar are present within <br /> most concrete structures. The estimated volumes of concrete and block wall materials at each work <br /> area as observed at ground surface are as follows: <br /> Conveyor Corridor 32 cubic yards <br /> Stockpile B 39 cubic yards <br /> Stockpile M Negligible <br /> Warehouse Vicinity 2,642 cubic yards <br /> The preceding figures are estimations,only. CONTRACTORS are encouraged to perform independent <br /> verification measurements in order to ascertain the true volume of materials at each location. <br /> Except as otherwise required in this Invitation to Bid, in those instances where foundations, rubble or <br /> building remnants would be covered by a minimum of four feet K) of material as a result of backfilling <br /> and grading operations contemplated in these Special Conditions (see Task 4, Earth Work), removal of <br /> the structure is not required. All other rubble and assorted debris, including metallic and wood <br /> materials, miscellaneous trash, debris'and scrap, encountered in the project area will be removed and <br /> placed with the building rubble at the designated disposal areas so that no rubble or debris remain at <br /> the work areas except at the disposal areas. <br /> The concrete and block wall materials, and all other rubble, trash and debris, shall be placed against <br /> the designated back walls and cuts, and shall be evenly spread at the base of these features along their <br /> lengths. All of the debris and rubble shall be covered by a minimum of four feet K) of backfill material <br /> during completion of Task 4, Earth Work. <br /> Following is a general description of the demolition work to be accomplished at each work area. Failure <br /> to describe specific concrete or block gall structures does not negate the requirement to complete <br /> demolition as per these specifications. <br /> 7 <br />