Laserfiche WebLink
1.1 DESCRIPTION <br />1.0 MOBILIZATION/DEMOBILIZATION <br />This specification covers the CONTRACTOR'S operations for: <br />a. Payment of premiums for bonds and insurance acquired specifically for the <br />construction of this project, including premiums for performance and <br />payment bonds; <br />b. Movement of personnel, equipment, operation supplies, and incidentals to <br />the project site; <br />c. Establishment of office, buildings, and other necessary temporary facilities <br />at the project site; <br />d. Preparatory work at the construction site; and, <br />e. All temporary barricades or fencing used to safeguard mine openings <br />during construction. Any shafts which were fenced prior to construction, or <br />other openings designated by the Principle Representative, shall be <br />protected by a temporary fence during non - working hours. <br />f. Demobilization of CONTRACTOR'S equipment and all other facilities, final <br />project clean -up, and for all other work for which payment is not otherwise <br />provided for under the contract. <br />The temporary facilities may include, but not be limited to the following: <br />a. Workshops, offices, storage yards, and construction plant and equipment <br />including spare parts, fuels, and oil; <br />b. Sanitation facilities, communication facilities, and sprinkler trucks; <br />c. Contractor's electrical power system; and, <br />d. Other items such as water, compressed air, etc., not specifically listed but <br />required for the functioning of construction activities. <br />11 <br />