Laserfiche WebLink
Bid. If the CONTRACTOR plans to furnish a machine other than the minimum FHP listed <br />on the Invitation and Bid, he must write the FHP of the machine, in ink, under the bid item <br />on the Invitation and Bid, or include it on the List of Equipment Offered form. <br />After the successful bidder has furnished evidence of the FHP capacity of the equipment <br />to be used, the amount bid for Equipment Rental will be modified by reversing the above <br />procedure to reflect the unit price desired by the CONTRACTOR with a corresponding <br />reduction in the quantity of hours required. This modified hourly rate and number of <br />hours will appear on the Purchase Order. <br />19.3 EXECUTION <br />Operators <br />The equipment shall be furnished complete with competent operating personnel. <br />Operators shall be qualified to perform all work under this specification in a skillful and <br />professional manner. The OWNER may, in writing, require the CONTRACTOR to remove <br />from the work any employee the OWNER deems incompetent or careless. The OWNER <br />will be the sole judge of the acceptability of any employee. <br />Supervision <br />The CONTRACTOR shall be responsible for the supervision of all mechanical operations <br />of the equipment including proper maintenance. <br />Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants <br />and fuel is minimized. <br />Performance of Work <br />Supplemental work shall be performed after the general construction work in that <br />particular area and shall consist of general earthmoving or other finishing work as may <br />be directed by the PROJECT MANAGER. <br />All operations under this section will be under the direct supervision of the PROJECT <br />MANAGER and work under this section shall be performed only as ordered and directed <br />by the PROJECT MANAGER. The PROJECT MANAGER will designate the work to be <br />performed and the order in which it is to be done, and WILL inspect all work. The <br />PROJECT MANAGER will maintain documentation of the work. <br />15 <br />