My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (199)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (199)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:13:20 AM
Creation date
6/13/2012 10:32:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment Rental Documentation <br />At the close of each day's operations during which equipment rental work has been <br />conducted under this specification, the PROJECT MANAGER shall prepare a form entitled <br />"Equipment Rental Record" listing the date, times and total hours (computed to the <br />nearest one -half hour), each piece of equipment was operated in accordance with this <br />specification. The PROJECT MANAGER will obtain the signature of the CONTRACTOR <br />on the form. <br />"Operation" means that time spent in performing work as well as time necessary for <br />moving equipment around the work site when directed by the PROJECT MANAGER. <br />However, "operation" does not include that time spent in transporting the equipment to <br />the initial work site, removing the equipment when all work had been completed, <br />transporting the equipment away from and returning it to the work site in the event of a <br />temporary or seasonal suspension of operation, maintenance of the equipment, any time <br />during which the equipment is "bogged down" or otherwise not working, nor for any <br />periods when operations are suspended by the PRINCIPLE REPRESENTATIVE. <br />19.4 MEASUREMENT AND PAYMENT <br />The number of hours each piece and type of equipment used as directed by the PROJECT <br />MANAGER under this specification will be counted to the nearest one -half hour. <br />Payment will be made at the unit price established by the Invitation and Bid Sheet and <br />in the purchase order contract for supplemental earthwork for each piece and type of <br />equipment. Such payment shall include the cost of all materials, accessories, labor, <br />maintenance, operating supplies, salaries of operators, and any other expenses <br />incidental to the operation of the equipment in the performance of work in accordance <br />with this specification and bid item(s). No extra payment will be made for the use of the <br />same equipment while performing work on other bid items on the Invitation and Bid <br />Sheet, Bid Schedules or Purchase Order Contract. No additional payment will be made <br />for hauling equipment to or away from the work site except as may be proper under <br />Mobilization/Demobilization. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.