My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (199)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (199)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:13:20 AM
Creation date
6/13/2012 10:32:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.1 DESCRIPTION <br />19.2 EQUIPMENT <br />19.0 EQUIPMENT RENTAL <br />This specification covers the furnishing and operation of equipment for other <br />supplemental earthwork as directed by the PROJECT MANAGER. <br />All equipment shall be of the type and equipped as specified in the Special Conditions <br />and on the Invitation and Bid. Mounted or attached equipment shall be that customarily <br />manufactured for the respective size of equipment being offered. Size will be determined <br />by maximum flywheel horsepower ratings at sea level and are the minimum size that <br />shall be furnished and operated. <br />Equipment must be in good operating condition and must be maintained in good <br />operating condition by the CONTRACTOR throughout the life of the contract. The <br />PROJECT MANAGER shall be the sole judge of whether equipment is or is not in "good <br />operating condition". <br />The number of hours indicated in the Special Conditions and on the Invitation and Bid <br />Sheet are estimated. It is impossible to determine in advance the actual number of hours <br />that the equipment will be required to be used, or to guarantee that any equipment rental <br />will be necessary. <br />Calculations for FHP Adjustments <br />Equipment of any size above the minimum flywheel horsepower may be furnished subject <br />to the approval of the PROJECT MANAGER. In order to evaluate the bids for various sizes <br />of equipment proposed to be furnished by the bidders, the unit price inserted in the bid <br />must be adjusted. The bidder may figure the unit price to insert in the Invitation and Bid <br />by doing the following computation for the applicable bid item: <br />(Rate you want per hour) X (Requested FHP) = Price on Bid Schedule <br />(The FHP of your machine) <br />EXAMPLE: If the desired unit rate to be received is $70.00/hour for a 215 FHP bulldozer <br />and the minimum FHP requested is 140, then multiply $70.00 x 140/215 = $45.50 per hour. <br />Use that calculated amount ($45.50 in the example) as the unit price on the Invitation and <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.