Laserfiche WebLink
attached to this Invitation for Bid. This map depicts the locations of the structures which <br /> were located within the Project Area, as represented by Mid-Continent Resources to the <br /> Division of Minerals and Geology. <br /> Certain concrete structures will not be removed during performance of this Project. <br /> These structures are the wing walls associated with the two large culverted crossings of <br /> Coal Creek, the concrete ditch located above and immediately south of Coal Creek, the <br /> Dutch Creek Flume. <br /> Disposal <br /> Except as otherwise described in this Invitation to Bid, all rubble and assorted debris, <br /> including metallic materials, miscellaneous trash, debris and scrap encountered in the <br /> project area will be removed and placed with the building rubble at the designated <br /> disposal areas so that no rubble or debris remain at the work areas except at the <br /> disposal areas. Scrap wood materials shall be segregated from other debris and <br /> stockpiled in a location designated by PROJECT MANAGER. <br /> The rubble generated as a result of the demolition process, including all other rubble, <br /> trash and debris, shall be placed against the designated back walls and cuts, and shall <br /> be evenly spread at the base of these features for the length of the disposal area (Map <br /> 3, Project Area). The rubble shall be placed as tightly as possible within the disposal <br /> area(s), which shall not exceed a height of forty five feet (45') as measured from the base <br /> of the disposal site on the northern edge. The outslopes established by disposal of the <br /> rubble may not exceed 3.5H:1V upon completion of the Project. A roadway passable by <br /> a minimum of a 5 cubic yard end dump truck, at a grade not to exceed 5%, must be <br /> established up the rubble piles. A flat area sufficient in size for the specified truck to turn <br /> around at the top of each disposal site without backing must also be created. This must <br /> be completed by the end of the disposal process. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a <br /> lump sum bid under Item 2 on the Bid Schedule. This lump sum bid will cover all costs <br /> for structural demolition and removal of rubble and debris from each work area, <br /> described above, to the disposal areas. Payment shall be as this task is completed and <br /> approved by the PROJECT MANAGER.. <br /> TASK 3 SEDIMENT CONTAINMENT MEASURES <br /> It is the responsibility of CONTRACTOR to ensure that the integrity of the existing <br /> sediment control system located within the Project Area is maintained. Drainage ditches <br /> 9 <br />