My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (198)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (198)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:14:35 AM
Creation date
6/13/2012 10:32:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
traverse the project area at the northern perimeter just south of Coal Creek, and at two <br /> locations near the central and southern portions of the Project Area (see Map 3). <br /> Although the concrete ditch linings will be demolished during Task 2, Demolition, <br /> CONTRACTOR must maintain the ditch dimensions and integrity in their current <br /> locations. <br /> Silt fences (sediment containment fences) will be installed as per manufacturers <br /> specifications (Figure 1, Typical Silt Fence Installation) at various locations to minimize <br /> the transportation of sediment from the construction area. Placement of silt fencing will <br /> occur at locations specified by the PROJECT MANAGER. The CONTRACTOR will supply <br /> the prefabricated silt fence with posts (Mirafi Prefabricated Silt Fence with Posts having <br /> a 3 foot width and 8.2 feet between posts, or equivalent). It is estimated that 800 feet of <br /> silt fence will be installed at the Project Area. <br /> Measurement and Payment <br /> Silt fences erected will be measured to the nearest linear foot. However, the use of silt <br /> fence is NOT guaranteed. Payment for this task will at the prices established in Item 3 <br /> of the Bid Schedule per lineal foot installed. Such payment shall be considered full <br /> compensation for all labor, materials, equipment and all other items necessary and <br /> incidental to the furnishing and placement of the sediment containment fences as <br /> directed and described in the specifications. Payment will be as this task is completed <br /> and approved by the PROJECT MANAGER. Payment for this task will be made only for <br /> the unit price shown under Item 3 of the Bid Schedule. <br /> Task 4 Equipment Rental <br /> Additional areas in and adjacent to the project area may require slope reduction, <br /> excavation or erosion control work. A CAT D-7H or equivalent 215 FHP machine with <br /> operator, a CAT 416B Backhoe loader or equivalent 74 fhp machine with operator, and <br /> a five (5) cubic yard on/off highway dump truck with operator shall be furnished for <br /> additional work as needed. <br /> The hours outlined in Task 4 of the Bid Schedule are NOT guaranteed. All work will be <br /> accomplished according to Specification 19.0, Equipment Rental, attached. <br /> Measurement and Payment <br /> Measurement and payment will be made as per Specification 19.0, Equipment Rental, <br /> which is attached. Payment will be made at the unit prices established in Item 4 of the <br /> Bid Schedule. The hours outlined in Item 4 of the Bid Schedule are NOT guaranteed. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.