Laserfiche WebLink
water storage tank and to the 016 ponds will be accomplished during completion of this <br /> Project. These roads will be reclaimed in a manner similar to that employed on Roads <br /> E, F, G. The roads will be graded to a configuration so that they have a slope of <br /> approximately 5% to the outside, any culverts will be removed and the road surface will <br /> be ripped to twelve to eighteen inches on no greater than thirty inch centers. <br /> In order to facilitate access to the north portion of Coal Basin and to the Rock Dump <br /> Facility, low water crossings will be constructed; one on Dutch Creek, and one on the <br /> North Fork of Dutch Creek. The crossings will effectively replace the culverts <br /> previously removed. The low water crossings will be constructed approximately fifty <br /> feet upstream of the current culvert locations in order to take advantage of the stream <br /> gradient and surrounding land forms. Each low water crossing will be armored with <br /> appropriately sized rock. Armoring of the stream bed and entry and exits will be <br /> accomplished. <br /> TASK 8 EQUIPMENT RENTAL <br /> Additional areas in the vicinity of the Rock Tunnel entry area may require additional <br /> grading, excavation, slope reduction, or erosion control work under the direction of the <br /> PROJECT MANAGER. A CAT D-6D or equivalent 140 FHP machine with operator, <br /> and a CAT 416B Backhoe loader or equivalent 74 fhp machine with operators shall be <br /> furnished for additional work as needed. The hours outlined in Item 8 of the Bid <br /> Schedule are NOT guaranteed. <br /> All work will be accomplished according to Specification 19.0, Equipment Rental, which <br /> is attached. Any additional dozer or backhoe work which may arise will be covered <br /> under this task. <br /> Measurement and Payment <br /> Measurement and payment will be made as per Specification 19.0, Equipment Rental, <br /> of the "Standard Work Specifications, Colorado Inactive Mine Reclamation Program", <br /> 1996, which is attached. Payment will be made at the unit prices established in Item 8 <br /> of the Bid Schedule. The hours outlined in Item 8 of the Bid Schedule are NOT <br /> guaranteed. <br /> TASK 9 REVEGETATION <br /> INCLUDE SURFACE ROUGHENING OF BACKFILL AND PLACEMENT OF MANURE <br /> AND INCORPORATION IN BACKFILL SURFACE <br /> All areas disturbed during reclamation work and any other areas specified in these <br /> Special Conditions will be revegetated according to the Revegetation Specifications in <br /> the General Bid Specifications Section 20.0, except as modified by these Special <br /> Conditions. All areas will be seeded with the "Mine Site Seed Mixture", (Table 1). <br />